Precautions during pouring of concrete placing boom
Precautions during pouring of concrete placing boom
When the concrete distributor starts the pump, the dangerous area is the surrounding area where the discharge hose can shake out, and the area diameter is twice the length of the discharge hose....
[2021-08-24]
What are the maintenance methods of concrete placing boom?
What are the maintenance methods of concrete placing boom?
The type of concrete placing boom,the wall thickness of concrete pump pipe and the weight of concrete pump pipe shall correspond to their own concrete pump....
[2021-08-24]
Requirements on how to operate concrete pump truck in different seasons
Requirements on how to operate concrete pump truck in different seasons
When waiting for concrete, try to keep the pump pipe of the concrete pump truck full of ash, and insert the hose port into the concrete to prevent cold air from entering and freezing the pipe. The concrete pump truck shall timely check the concrete freezi...
[2021-08-24]
Parameter problems needing attention when purchasing pump truck
Parameter problems needing attention when purchasing pump truck
With the characteristics of large conveying capacity and transportation, concrete conveying pump plays a very important role in speeding up the construction progress, shortening the construction period and reducing the construction cost....
[2021-08-24]
Precautions for operation and construction of concrete pump truck hose
Precautions for operation and construction of concrete pump truck hose
Before the small concrete pump truck pumps concrete, first pump clean water, check the pipe clamp to ensure that there is no water seepage, and then pump the pipeline lubricant....
[2021-08-24]
Do you know the reasons that affect the difficulty of pumping concrete?
Do you know the reasons that affect the difficulty of pumping concrete?
Reasons affecting the difficulty of pumping concrete by the pump truck: the pump pipe resistance increases due to the removal of solidified old concrete in the pump pipe....
[2021-08-24]
How to prevent rollover of small concrete pump truck?
How to prevent rollover of small concrete pump truck?
The boom of small concrete pump truck is mainly used for cloth distribution. During normal cloth distribution, the boom posture needs to be changed constantly. The center of gravity point of the whole vehicle is also different due to different boom postur...
[2021-08-24]
What principles should be followed when driving the concrete pump truck?
What principles should be followed when driving the concrete pump truck?
When the concrete pump truck crosses underpass, bridge, tunnel or overhead pipeline and overhead cableThere should be enough space and distance....
[2021-08-24]
How to clean the concrete residue in the tank caused by sudden failure of cement mixer
How to clean the concrete residue in the tank caused by sudden failure of cement mixer
When the concrete mixer fails, the internal concrete shall be discharged in time It shall be noted that after the concrete is discharged, the concrete mixer shall be restored to its original state....
[2021-08-24]
How to choose wear-resistant pump pipe?
How to choose wear-resistant pump pipe?
The pump pipe can be configured according to the specific construction pressure and the vertical height of the building. Generally, the low-pressure pump pipe is configured below 80m, and the high-pressure pump pipe is configured above 80m as far as possi...
[2021-08-24]